CLIENT:

MacDonald

AREA:

110.000 sqm. Terminal

ABOUT PROJECT:

Concept Design

DESCRIPTION:

The objective was to facilitate the full development of an international airport as a major gateway to and from the Philippines to alleviate traffic congestion and to accommodate the growing traffic through North and Central Luzon. GMWM was invited to enter the D&B tender together with an international construction and project management team.

The first phase of the project comprises design of the New Terminal Building and Ancillary Facilities, car park, landside connection roads, aircraft parking apron and airside service roads.

The design solution meets the critical design parameters such as passenger circulation, safety and security, operational efficiency, flexibility and adaptability, revenue generation, energy efficiency and local factors.
The layout is based on the horizontal separation of departures and arrivals. The modular design concept allows large proportion of the building components to be prefabricated resulting in faster and more economical method of construction.